Review the evidence below, then approve or refuse the governed response. Your decision will produce a KATLAS-signed receipt.
Storm delay + yard congestion + documentation hold + pharma cut-off
A storm has narrowed the tidal window into Greenport. MV Northern Wave reports a 4h ETA slip. The yard is at 92% capacity. One container is under compliance hold. A temperature-controlled pharma shipment has a regulated cut-off in 90 minutes.
Hashed references travel to the signing node. Public receipt exposes the reference.
- vessel eta changevessel:NW-118E:eta_drift_4hheld by: Carrier / Shipper
- yard capacity signalterminal:greenport:utilisation_0.92held by: Terminal Operator
- documentation holdcontainer:HLBU-220987-5:doc_holdheld by: Carrier / Shipper
- pharma cutoff windowcontainer:MSCU-779431-2:cutoff_16:00held by: Carrier / Shipper
Controlled by the holder. Not sent to KATLAS. Not on the public receipt.
- shipper commercial termsshipper:contract:NDAheld by: Carrier / Shipper
- container manifest detailsmanifest:internalheld by: Carrier / Shipper
Approve or refuse the governed response package. The selected action will be sent to KATLAS for live signing.
Historical context · simulated demo recap — not KATLAS-signedThe panels below walk through the original simulated 6-action governance recap (Allowed · Blocked · Escalated). They do not produce KATLAS-signed receipts. The signed receipt above is the live proof. Click to expand.
Expand ▾
The panels below walk through the original simulated 6-action governance recap (Allowed · Blocked · Escalated). They do not produce KATLAS-signed receipts. The signed receipt above is the live proof. Click to expand.
Storm delay + yard congestion + documentation uncertainty
Corridor: Greenport ↔ Inland Distribution · Vessel: MV Northern Wave · Voyage NW-118E
- 08:12Met office issues Force 8 advisory for approach channel
- 08:40MV Northern Wave reports ETA slip of ~4h
- 09:05Greenport yard utilisation at 92% — congestion threshold exceeded
- 09:18HLBU 220987-5 flagged: documentation pending compliance review
- 09:24Inland haulage requests revised gate-out windows
- 09:31Predictive layer: high probability of missed pharma cut-off (MSCU 779431-2)
- Re-slot non-priority container TGHU 105540-1Allowed→ Terminal Yard Supervisor
- Gate-out HLBU 220987-5 ahead of compliance clearanceBlocked→ Haulage Coordinator
- Authorise priority handling for MSCU 779431-2 (pharma cut-off)Escalated→ Port Operations Lead
- Authorise restow override on inbound stack planEscalated→ Vessel Operations Coordinator
- Notify shipper of cut-off risk on MSCU 779431-2Allowed→ Customer Service / Escalation Lead
- Compliance release of HLBU 220987-5Allowed→ Compliance / Release Officer